Leadership Team

Justin Arnold

Managing Director

Justin has 22 Years experience in the construction industry specialising in electrical and controls design and installation for the HVAC&R industry. Justin spent 7 Years…

David Arnold​

Director / Construction Manager

David has spent the last 20 Years in the Construction Industry specialising in the delivery of electrical and control systems. His origins in the industry stem from his days…

Geoff Izzard

Director / Controls & Engineering Manager

Geoff has spent 13 years in the industry and holds a diploma in software engineering and is a qualified electrician. This gives him a unique depth of knowledge…

Vince Dunn

Business Development Manager

Vince has been in the Building Automation Controls Industry since 1993 and has a vast range of knowledge in several Building Management Systems. Vince uses his 20+ years experience…

Justin Arnold

Managing Director
Justin has 22 Years experience in the construction industry specialising in electrical and controls design and installation for the HVAC&R industry. Justin spent 7 Years with Siemens Building Automation in Sydney as a controls technician programming & commissioning projects including data centres, hospitals, commercial developments and universities. During this time he gained a thorough understanding as to how multinational organisations operate, and effectively applies this knowledge to run an efficient, focused & streamlined business specialising in Building Automation Controls.

David Arnold

Director / Construction Manager
David has spent the last 20 Years in the Construction Industry specialising in the delivery of electrical and control systems. His origins in the industry stem from his days as an apprentice electrician with Control & Electric, project management, through to his current position of construction manager for IES. His ability to liaise with builders and coordinate services throughout the project is his strengths. This is demonstrated through a strong repeat client base and continued relationships.

Geoff Izzard

Director / Controls & Engineering Manager
Geoff has spent 13 years in the industry and holds a diploma in software engineering and is a qualified electrician. This gives him a unique depth of knowledge of the programming and technical requirements for Automated Controls systems. Geoff’s strength lies in his commitment to detail and the ability to interact with and interpret the client’s needs, and deliver the design requirements for the most economical and energy efficient outcome.

Vince Dunn

Business Development Manager
Vince has been in the Building Automation Controls Industry since 1993 and has a vast range of knowledge in several Building Management Systems. Vince uses his 20+ years experience and industry knowledge to assist with the delivery of our Building Automation System and to ensure the client is 100% happy with the end result.

Bimberi Youth Justice Centre

Project Summary

Slider-3-1.jpg

This project consisted of thirteen high security state of the art residential, education & training, recreation, administration and other support facilities enclosed by a secure perimeter. The mechanical services in this unique project consisted of heating and chilled water plan, in-slab heating and VRV.
The BMS system is controlled via a central head end residing in the administration building. IES successfully delivered the project and continues to undertake the maintenance.

Highlights

Client

Hindmarsh

Location

Canberra City

Completion

2015

Technology
  • Reliance Controls….,
  • Automated backup power

28 Sydney Avenue

Project Summary

Slider-3.jpg

This project included not only the innovative 5 Star NABERS Energy rated office building construction but also an integrated fit-out. Mechanical systems include chilled and heating water systems utilizing water cooled chillers and gas fired boilers. Air systems include AHUs, FCUs, general ventilation systems and carpark ventilation and air quality monitoring system.

Using a High Level Interface the BMS communicates with chillers, VRF air conditioning system and Variable Speed Drives controlling pumps and fans. Remote monitoring of the BMS is possible via an ADSL connection using a web interface.

Highlights

Client

Hindmarsh

Location

Canberra City

Completion

2015

Technology
  • Reliance Controls….,
  • Automated backup power

One Farrell Place

Project Summary

the-cube

This project was carried out with 75% of the building tenanted. Controls were upgraded floor by floor until equipment in the roof-top plantroom was strategically replaced. Systems included all fan and pump motors replaced and controlled by new VSDs, new chiller and boilers.

The BMS controls all VSDs via HLI which means the BMS is able to access a wide range of information directly from the VSD over a single cable. Energy monitoring in the building is handled by the BMS and includes electrical meters and gas metering.

Highlights

Client

Benmax

Location

Canberra City

Completion

2015

Technology

– Reliable Controls….
– Automated backup power

Project: 212 Northbourne

Project Summary

Slider-3

T212 Northbourne Avenuehis project was undertaken to refurbish this unique buildings’ mechanical services plant to achieve a 4.5 star NABERS rating. The works included a full mechanical system upgrade including replacement of chilled, heating and condenser water systems.

Systems monitored include electrical meters, gas meters and water meters. A subsequent fit out was integrated into the base-building BMS with minimal re-engineering.

Highlights

Client

Benmax

Location

Canberra City

Completion

2015

Technology
  • Reliance Controls….,
  • Automated backup power